The Decision Support Process and the Integrated Modelling Platform are complementary components of TPRAF. This page sets out how they work together, including which IMP outputs each of the six DSP processes draws on.

The division of labour

Decision Support ProcessIntegrated Modelling Platform
ProvidesThe decision-making structureThe analytical capability
Through whichProblems are identified, risks assessed, interventions developed and options evaluatedFuture conditions are simulated, system impacts quantified, and the consequences of alternative decisions evaluated
ProducesThe questions that need answeringThe evidence that answers them

What the DSP asks

The DSP defines the questions that require investigation:

  • Which assets, networks or services are of concern?
  • What planning horizons should be considered?
  • Which uncertainties should be explored?
  • Which future climate, demand or operational scenarios should be assessed?
  • What risks require investigation?
  • What interventions are being proposed?
  • What outcomes are being sought?

What the IMP supplies

The IMP supports the DSP by providing evidence relating to:

EvidenceDocumented in the IMP handbook
Climate and weather scenariosClimate scenarios
Hazard occurrence and severityHazard models
Future transport demandTransport demand
User behaviour and mobility patternsSocial behavioural impacts
Infrastructure deteriorationTransport supply
Transport-system disruptionTransport model
Economic, environmental and social impactsPerformance metrics
Consequences of alternative interventionsAdaptation measures

The IMP's distinctive contribution

A key function of the IMP is to quantify how asset deterioration, disruption and intervention options affect the wider transport system, its users, and the services it provides.

That reach beyond the individual asset is precisely what the DSP's own modules cannot establish. An asset-level assessment can tell you a bridge will fail; only a system model can tell you what that does to the journeys that depend on it.

Either one can be used alone

The DSP can operate without the IMP where sufficient evidence already exists. Equally, individual IMP components may be used independently of the DSP.

But the value is in the combination

The handbook states that the greatest value is achieved when the two are used together, allowing decisions to be informed by quantified evidence rather than assumptions alone.

Stage by stage

The role of the IMP varies throughout the DSP. In some stages it describes future conditions and uncertainties; in others it quantifies the consequences of deterioration, disruption or intervention. The interaction therefore changes as the decision progresses.

1. Asset / Network Evaluation

The IMP provides evidence relating to:

  • Climate scenarios
  • Weather variables
  • Hazard models
  • Transport demand
  • Transport supply
  • Transport-system performance
  • Impact assessment metrics

These support evaluation of current and future system performance, resilience, capacity and risk, and provide evidence on the potential consequences of deterioration, disruption and failure across the wider transport system.

The DSP process

2. Problem Framing and Scope

IMP outputs help stakeholders understand:

Future operating conditionsWhat the system will have to cope with
System vulnerabilitiesWhere it is weak
Potential future constraintsWhat will limit the options
Emerging risks and pressuresWhat is coming that is not yet a problem

This supports the identification, prioritisation and definition of problem statements, helping ensure that subsequent activity focuses on the issues of greatest significance.

The DSP process

3. Risk Reduction Analysis

The IMP supports understanding of:

  • Consequences of deterioration
  • Consequences of disruption
  • Consequences of system failure
  • Potential risk-reduction benefits

This helps determine whether identified risks are acceptable, and supports assessment of risk-reduction strategies by quantifying the consequences of different future outcomes.

The DSP process

4. Detailed Option Assessment

The IMP can be used to evaluate:

  • The impacts of alternative interventions
  • Changes in transport performance
  • User impacts
  • Economic impacts
  • Environmental impacts
  • Social impacts
  • Network-level consequences

This enables comparison of alternative interventions using quantified evidence.

The DSP process

5. Portfolio Optimisation

The IMP can be used to assess:

  • Multiple intervention portfolios
  • Different implementation timings
  • Future demand scenarios
  • Alternative climate futures

This is where the IMP earns its keep

Comparing portfolios under different future conditions is what identifies robust strategies: those that perform well across multiple climate, demand and disruption scenarios, rather than only under the single future that was assumed.

A portfolio optimised for one projected future is a bet. One tested across several is a strategy.

The DSP process

6. Outcome Assessment

The IMP can be used to compare predicted and observed outcomes, and support learning from implemented interventions. That information is then fed back into future iterations of both the DSP and the IMP.

The DSP process

The interaction is iterative, not linear

This is the point the handbook returns to most often.

The DSP identifies the problems, risks and intervention options requiring investigation. The IMP quantifies future conditions, system impacts and the consequences of the alternatives. The resulting evidence is then used to:

  1. Refine assumptions that proved wrong or too coarse
  2. Modify interventions in light of how they performed
  3. Reassess risks against the quantified consequences
  4. Evaluate whether predicted outcomes are acceptable, before progressing

Only then does the process move to the next DSP stage.

The loop runs in both directions

Outputs produced by the IMP inform decisions within the DSP, while decisions made within the DSP define the scenarios, interventions and questions to be explored within the IMP.

Neither is upstream of the other in any permanent sense.

This feedback is what enables interventions, assumptions and strategies to be tested, refined and reassessed before implementation, improving the robustness and transparency of decision-making.

A missing figure

The source handbook refers to Figure 6.1, illustrating the interaction between the DSP and the IMP, and the caption is present in the document. The figure itself was never inserted, so it cannot be reproduced here.

It is one of two missing figures in the handbook. The other is Figure 2.1, the overview of the DSP embedded within TPRAF.

Further reading

The IMP has its own handbook covering the nine components in full. Start at the IMP introduction, or go directly to the framework overview, which carries the conceptual diagram the IMP is built around.