Skip to content

Risk Mitigation Module

Named as a module, but given no section of its own

Risk Mitigation is listed as one of the seven DSP modules in Definition of a module, and described there. Unlike the other six, it has no section in the Technical Modules chapter of the source handbook, so there is no material under the usual headings for its methods, tools, inputs or outputs.

Its dependencies are documented, but they appear in the wrong place: under "Iterative steps within the process" in Problem Framing and Scope. That material is reproduced here, where it belongs.

Nothing has been written to fill the remaining gaps.

What the module does

Risk Mitigation evaluates the risks, costs and benefits of intervention plans, meaning proactive measures. It combines two techniques:

TechniqueWhat it produces
iAsset-condition based Risk-Cost-Benefit AnalysisQuantifies and, where possible, monetises environmental, social, economic and cultural impacts
iiMulti-Criteria Decision AnalysisScores options against the organisation's own objectives and criteria

On that combined basis it prioritises interventions under legal, financial, economic and time constraints, at asset, system and network levels.

A multi-stage decision module

The module depends on upstream risk and asset information, and internally links optioneering with portfolio optimisation before selected schemes proceed to detailed development and delivery.

Two DSP processes are stages of this one module

This is the structural point that is easy to miss. Detailed Option Assessment and Portfolio Optimisation are described here as internal stages of the Risk Mitigation Module, rather than as independent processes that merely use it.

Optioneering identifies and assesses feasible interventions; portfolio optimisation selects and combines them into a coordinated and deliverable programme.

Core activities

Three activities define the module's work. They appear in the source under Problem Framing, but describe mitigation rather than framing.

Define the mitigation objective

Specify:

  • The risk to be treated
  • The affected asset or service
  • The required performance outcome
  • The assessment horizon
  • Any unacceptable risk thresholds

Generate mitigation options

Identify a broad range of measures:

CategoryMeasures
Physical worksMaintenance, repair, renewal, strengthening, protection
InformationMonitoring
OperationalOperational controls, demand management
System designRedundancy
PreparednessEmergency preparedness
EnvironmentalNature-based or adaptation measures, where applicable

Only five of the eleven involve construction

The list deliberately spans well beyond building things. Demand management, monitoring and emergency preparedness are all legitimate mitigations, and they are usually the cheapest and fastest to deploy.

Consider interdependencies

Where an option affects connected assets or systems, test whether it creates additional requirements, constraints, benefits or unintended consequences elsewhere.

Upstream dependencies

SourceWhat it provides
Risk AssessmentPrioritised risks, risk drivers, likelihood and consequence values, and the baseline against which risk reduction is assessed
Asset Registry and Asset PerformanceAsset characteristics, condition, deterioration curves, capacity and expected future performance
Technical Details Database, or Options LibraryStandard materials, methods, designs, strategies, service lives, costs and applicability rules
Sustainability assessmentCarbon, environmental, life-cycle, biodiversity and socioeconomic criteria for option appraisal
Resilience analysisOption-comparison criteria such as robustness, redundancy, recoverability and disruption reduction
Asset and system interdependency modellingPhysical, informational, geospatial, functional and logical relationships that may change the feasibility, cost or benefit of an option
User and stakeholder inputDecision criteria, constraints, risk appetite, service requirements and acceptable trade-offs

Resilience assesses the options, not the original risk

The handbook is precise about the resilience relationship: it is used to assess the merits of mitigation options, rather than as a direct input to the original risk calculation.

This is the same boundary Resilience states from its own side, where it notes twice that it does not feed the risk valuation model or the risk matrix.

Internal and downstream dependencies

StageWhat it does with the module's output
Portfolio optimisation stageReceives the feasible intervention options, mitigation packages, adaptation pathways, cost and benefit estimates, risk-reduction values, delivery constraints and dependencies produced by optioneering. Prioritises activities, develops schedules and allocates resources at route or portfolio level
Scheme outline designDevelops selected options into a more detailed and deliverable scheme definition
Funding and budgeting processesTest affordability and establish the Financial Case
Programme management, governance and reportingProvide approvals, assurance, monitoring and performance reporting, the Management Case
Procurement and commercial processesDetermine the delivery and contracting approach, the Commercial Case
Implementation and monitoringDeliver the selected intervention, and generate updated condition, cost and performance evidence for future risk and mitigation assessments

The last row closes the loop

Implementation does not end the process. It generates the evidence that the next risk and mitigation assessment will be based on, which is the same feedback the decision support cycle describes at framework level.

The three middle rows correspond to the three outputs shown leaving this part of the master diagram, labelled with their HM Treasury business case names.

Where the module's techniques are documented

Although the module has no section of its own, both of its techniques are described in full as part of the technical processes:

TechniqueWhere it is documented
Multi-Criteria Analysis, including criteria selection, pairwise weighting, scoring and aggregationDetailed option assessment
Risk-Cost-Benefit Analysis and economic appraisalDetailed option assessment
Screening a long list down to a shortlistRisk reduction analysis
Prioritising and sequencing across a programmePortfolio optimisation

A question for the authors

Given that the analysis lives in the technical processes, and that two of those processes are described here as internal stages of this module, it is worth confirming whether Risk Mitigation is intended as a distinct module alongside the other six, or as the umbrella under which stages four and five operate.

The two readings imply different answers to whether the module list should say six or seven.