Economic impacts

Codes EC1 to EC10. The final link in the chain, where every preceding dimension is expressed in pounds.

The ten metrics fall into three groups by who bears the cost: users, the organisations that own and run the network, and society at large.

The metrics

CodeMetricApplies to
EC1Cost of journey delay (£)Short and long-term
EC2Cost of journey cancellation (£)Short and long-term
EC3Public transport revenue loss (£)Short and long-term
EC4Cost of emergency response (£)Short and long-term
EC5Cost of asset repair, including labour costs (£)Short and long-term
EC6Cost of asset reconstruction, including labour costs (£)Long-term only
EC7Cost of increased GHG emission (£)Long-term only
EC8Cost of increased air pollutant emission (£)Long-term only
EC9Cost of injuries and fatalities (£)Short and long-term
EC10Cost of social inequity (£)Long-term only

User costs: EC1 and EC2

EC1: Cost of journey delay

The cost of journey delay for users can be quantified as the product of total delay time and the value of time.

That value should ideally be differentiated by journey purpose, to account for variation in the economic value of time across different travel purposes such as commuting, business or leisure.

Why purpose-differentiated values matter

An hour lost from a business trip and an hour lost from a leisure trip are not economically equivalent, and standard appraisal practice values them differently.

Using a single blended value would systematically misprice disruptions depending on which kinds of trip they happened to hit. This is also why OP5 records cancellations by trip purpose.

EC2: Cost of journey cancellation

The cost of journey cancellation can be estimated from the number of cancelled trips and the associated generalised travel cost, reflecting the welfare loss incurred when trips cannot be completed.

No empirical estimates exist

The handbook states plainly that, to the best of the authors' knowledge, empirical estimates of cancellation costs are currently unavailable.

The generalised travel cost may therefore be approximated using proxy measures:

  • Income-based estimates
  • Applying a fixed number of hours valued using the value of time

Any EC2 figure is consequently a proxy rather than an observed cost, and should be reported as such.

Owner costs: EC3 to EC6

Owner costs encompass the financial losses of entities that own or manage transport systems.

CodeCostHow it arises
EC3Public transport revenue lossRevenue lost from bus service cancellations, obtained through ticket loss
EC4Emergency responseResponding to the disruption event
EC5Asset repairRepairing road asset damage, including labour costs
EC6Asset reconstructionRebuilding where damage is catastrophic, including labour costs

Repair and reconstruction are separate for a reason

EC5 applies to both short and long-term disruption; EC6 to long-term only.

The distinction tracks severity. A road that is damaged can be repaired within a short recovery period. A road that must be reconstructed implies the catastrophic asset damage and extended recovery that defines a long-term disruption scenario.

Societal costs: EC7 to EC10

Societal costs capture the broader external impacts on the wider community.

CodeCostDerived from
EC7Increased GHG emissionEN1
EC8Increased air pollutant emissionEN2 and EN3
EC9Injuries and fatalitiesSO8 to SO10
EC10Social inequitySO1 to SO5

EC10 is the hardest metric in the framework

No widely accepted valuation method

The cost of social inequity is inherently difficult to quantify, reflecting the absence of widely accepted methods for valuing distributional and equity-related impacts.

This is an open problem in the field rather than a gap in the framework. POESE includes the metric because the impact is real and should not be omitted simply because it resists monetisation.

In practice, the underlying social metrics may carry more weight than any monetary figure placed against EC10.

Required input data

Economic performance metrics are derived from agent-based model outputs together with relevant appraisal parameters.

IngredientSource
Delay, cancellation and activity outputsTransport model
Values of travel time, differentiated by journey purposeDepartment for Transport (2026)

Appraisal parameters should be cited and dated

Values of time are revised periodically. Because EC1 and EC2 scale directly with them, any published cost should state which parameter set and vintage it used, so results remain comparable across studies and over time.

Reading the economic dimension

The three groups answer different questions, and summing them into a single headline figure loses the distinction that matters most:

GroupQuestionWho pays
User costsWhat did travellers lose?Individuals, in time and foregone activity
Owner costsWhat did it cost to run and restore the network?Operators and asset owners
Societal costsWhat did everyone else absorb?The wider community

An adaptation measure that reduces owner costs while raising user or societal costs has not obviously improved anything, which is why POESE keeps the three visible separately.